About Huake Sensor Valley

Shandong Huake Semiconductor Research Institute Co., Ltd. is headquartered in Jinan, Shandong Province. It has established R&D centers in Beijing, Jinan, Chengdu, and Shanghai, an assembly center in Singapore, and technical support centers and sales centers in Shenzhen, Hangzhou, Kunshan, Taiwan and other places at home and abroad. Relying on the huge demand of the chip market and the future development plan of Huake, Huake will build Huake Semiconductor Industrial Park in domestic cities such as Linyi, Qingdao, Zibo, Yantai, Kunming, Haikou, Guiyang, and Urumqi. At the same time, Huake is actively expanding its international business and plans to establish Huake Semiconductor Industrial Park in Tashkent, the capital of Uzbekistan, and Japan to seek international markets and help build the Belt and Road Initiative.
Established the Joint Laboratory of Sensors of Chinese Academy of Sciences and the Joint Laboratory of Microfluidic Chips of Shandong University
Overall positioning
Create a high-tech, knowledge-based, intelligent, ecological and dynamic modern industrial production demonstration base

The project is developed and constructed by Shandong Huake Semiconductor Research Institute Co., Ltd. The project covers an area of about 153.1 acres, with a planned total construction area of 238,703.61 square meters, including 1 administrative office and living service facility complex, 1 high-rise standard factory building, 1 5-story self-use factory building and 26 4-story standard factory buildings.
The industry is dominated by sensors and semiconductor chips, intelligent manufacturing and high-end equipment, and advanced materials, and focuses on building a high-precision digital intelligent sensor production and research and development base; at the same time, it drives the agglomeration of related industries, vigorously supports the development of the real economy, promotes the transformation of new and old kinetic energy, and creates a new business card for the development of Jinan's new generation of information technology and intelligent manufacturing industries.
The first phase has a construction area of 38187.27㎡, including 3 single-family factories and 6 double-family factories. The first floor has a height of 7.2m and a load-bearing capacity of 2T/㎡, the second floor has a height of 4.2m and a load-bearing capacity of 800KG/㎡, the third and fourth floors have a height of 3.9m and a load-bearing capacity of 450KG/㎡, the column distance is 8.1m, and a 3T elevator shaft is reserved, with personnel and cargo diversion and natural gas reserved.
The second phase has a ground construction area of 165,273.9 square meters and an underground parking area of 33,223.25 square meters. It includes 2 single-family factories, 15 duplex factories, 1 triplex factory, 1 high-rise factory and 1 comprehensive building.