Dezhou Huake Production Progress Report
Release time:
2023-09-25
Dezhou Huake TO-92 and 1075B version MSOP8 two sets of calibration production equipment, on December 1, 2022, under the condition of limited epidemic manpower and with the assistance and support of the district government, through the cooperation of test engineer Zhang Chaochao and equipment engineer Jin Chenfei, the two sets of calibration equipment were debugged at the wrong time day and night. On December 9, 2022, through 9 days of unremitting efforts, the problem that the rotation and offset of TO92 new product cannot be confirmed is solved, and the test card version and test fixture are replaced through repeated verification. The calibration yield of MSOP8 was increased from 80% to 97%, which solved the problem of high misjudgment rate in workshop tests, successfully realized the smooth and efficient operation of the two production lines, and reached the targets of 16K output on TO92 and 3K output on MSOP8.
Two sets of calibration production equipment of Texas Huake TO-92 and 1075B version MSOP8 were launched on December 1, 2022, under the conditions of limited manpower during the epidemic, and with the assistance and support of the district government, through the collaboration of test engineer Zhang Chaochao and equipment engineer Jin Chenfei , debugging two sets of calibration equipment at different times day and night; through nine days of unremitting efforts on December 9, 2022, the problem of unknown rotation and offset of the new TO92 product and unable to confirm the test program was solved, and through repeated verification, the test card was replaced version and test fixture; increased the calibration yield rate of MSOP8 from 80% to 97%, solved the problem of high misjudgment rate in workshop testing, successfully realized the smooth and efficient operation of the two production lines, and reached TO92 daily output of 16K, MSOP8 has a daily output target of 3K.

Test technician Wu xiuquan (left 1), test engineer Zhang chao Chao (middle), equipment engineer Jin Chen Fei (right 1)
Related News
Finally, Tian Jinliang said that the company will live up to the expectations of the leaders. In 2023, the company will lay a good foundation, stabilize the industry, and "recruit and retain" professional talents. It will focus on the construction of enterprise research and development centers, the development of professional intelligence, foreign trade exports and other sectors, so as to push the company to become bigger and stronger and realize the cluster development of sensor industry chain in our district.
2023-09-25
On the afternoon of August 22, the Provincial Department of Industry and Information Technology held a conference to learn and convey the spirit of the provincial industrial and information work symposium and the industry association "Gathering the number one project and grasping the three economies" symposium. The purpose of the meeting is to thoroughly implement the spirit of the provincial industrial and information work forum, play the role of bridge and link, and improve the work efficiency of industry associations in the field of industry and information technology in our province.
2023-09-25
Dezhou manufacturing base full chain trial production success
Through debugging, the former Die Bond and Wire Bond equipment have fundamentally corrected the chip corner offset, crack, abnormal glue, gold wire collapse, gold ball offset and other undesirable phenomena. After verification, the chip shear force, gold wire pull, gold ball thrust have reached the standard, the chip yield has improved and remained stable at 99.8, in line with the industry standards.
2023-09-25
Dezhou Huake Production Progress Report
Dezhou Huake TO-92 and 1075B version MSOP8 two sets of calibration production equipment, on December 1, 2022, under the condition of limited epidemic manpower and with the assistance and support of the district government, through the cooperation of test engineer Zhang Chaochao and equipment engineer Jin Chenfei, the two sets of calibration equipment were debugged at the wrong time day and night. On December 9, 2022, through 9 days of unremitting efforts, the problem that the rotation and offset of TO92 new product cannot be confirmed is solved, and the test card version and test fixture are replaced through repeated verification. The calibration yield of MSOP8 was increased from 80% to 97%, which solved the problem of high misjudgment rate in workshop tests, successfully realized the smooth and efficient operation of the two production lines, and reached the targets of 16K output on TO92 and 3K output on MSOP8.
2023-09-25
Lu Energy Technology [2019] No. 22
According to the Provincial Party Committee and the General Office of the Provincial Government "Shandong Provincial Energy Bureau Responsibility Allocation, Internal Institutions and Staffing Regulations" (Lu Ting Zi [2019] No. 36), combined with the Provincial Energy Bureau "2019 Provincial Energy Work Guidance" (Lu Energy Office [2019] No. 15), we are now soliciting a batch of key new technologies, new products and new equipment in the energy field. Relevant matters are notified as follows.
2019-09-22